Enquire NowRamwall - Case Studies

Barking steel fabrication depot loading platform

Barking steel fabrication depot loading platform

1st May 2007

Major steel fabrication and supply company Kierbeck required a new loading platform for their factory in East London that could withstand the very heavy steel products waiting to be loaded onto

Read more
Caphouse Colliery tunnel portal retaining wall

Caphouse Colliery tunnel portal retaining wall

1st March 2010

The National Coal Mining Museum for England Trust commissioned NCD International to design and supply an anchored RAMWALL retaining wall to form the 8-metre high tunnel portal headwall..

Read more
Hillingdon railway cutting stabilisation

Hillingdon railway cutting stabilisation

1st April 2009

During 2008/9 Metronet Rail undertook major stabilisation works to railway cuttings in the Hillingdon area of London.

Read more
Epping to Theydon Bois embankment stabilisation

Epping to Theydon Bois embankment stabilisation

1st March 2009

Metronet Rail is undertaking and extensive programme of embankment stabilisation in the Central Line using piled reinforced concrete retaining walls and re graded slopes.

Read more
 