Ramwall - Case Studies
Barking steel fabrication depot loading platform
1st May 2007
Major steel fabrication and supply company Kierbeck required a new loading platform for their factory in East London that could withstand the very heavy steel products waiting to be loaded onto
Read moreCaphouse Colliery tunnel portal retaining wall
1st March 2010
The National Coal Mining Museum for England Trust commissioned NCD International to design and supply an anchored RAMWALL retaining wall to form the 8-metre high tunnel portal headwall..
Read moreHillingdon railway cutting stabilisation
1st April 2009
During 2008/9 Metronet Rail undertook major stabilisation works to railway cuttings in the Hillingdon area of London.
Read moreEpping to Theydon Bois embankment stabilisation
1st March 2009
Metronet Rail is undertaking and extensive programme of embankment stabilisation in the Central Line using piled reinforced concrete retaining walls and re graded slopes.
Read more